Second Home Completed On Time

The second house constructed by Rotary is finished and plans under way for the third. This house, also built on the edge of a steep bank, will replace the existing house made from metal sheets. Butch and the contractors worked several days to finish the foundation and wooden top.  Ken added his expertise on the window and door. Ken added the cross piece on the door which would prevent sagging, something local builders don’t seen to have caught onto.

Ken ponders the new building site.

Ken ponders the new building site.

Access to the site is just as difficult as the others.

Access to the site is just as difficult as the others.

The son Nicholas worked very hard alone site the contractors.

Butch and the oldest son Nicholas worked very hard along side the contractors.

The youngest daughter was another dynamo who helped as she could.

The youngest daughter was another dynamo who helped as she could.

 

150217AC_3135150214_1698150214_1694

 

Foundation completed.

Foundation completed.

"Two hands on the drill" Ken tells Nicholas.  The experience was good for the boy and he was appreciative.

“Two hands on the drill” Ken tells Nicholas. The experience was good for the boy and he was appreciative.

House number two done.

House number two done. Contractors Julian and Mario on the right, two great guys.

Advertisements
Categories: Uncategorized | 1 Comment

Post navigation

One thought on “Second Home Completed On Time

  1. Colleen davy

    Unbelievable awesome work! So proud of you!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: